(d) Mechanical acceptance testing.

p.511painted canvas or plastic cover. Cellular foam insulation shall be protected as above or painted with a coating that is water retardant and provides shielding from solar radiation that can cause degradation of the material.

p.512b. They are part of an altered system.

p.513B. Multifamily building central ventilation system heat recovery or energy recovery systems in

p.515TABLE 160.3-C DDC Applications and Qualifications

p.516CONTINUED: TABLE 160.3-D PIPE INSULATION THICKNESS REQUIRED (thickness in inches or R-Value) Space cooling systems (chilled water, refrigerant and brine)

Return Duct Sizing for Multiple Return Duct Systems p.514 Download CSV
System Nominal Cooling Capacity (Ton)*Return Duct 1 Minimum Nominal Diameter (inch)Return Duct 2 Minimum Nominal Diameter (inch)Minimum Total Return Filter Grille Nominal Area (inch2)
2.51414800
3.01614900
3.516161000
4.018181200
5.020201500

p.513multifamily buildings with four or more habitable stories shall be tested in accordance with NA7.18.4.

DDC Applications and Qualifications p.515 Download CSV
Building StatusApplicationsQualifications
Newly Constructed BuildingsAir handling system and all zones served by the systemIndividual systems supplying more than three zones and with design heating or cooling capacity of 300 kBtu/h and larger
Newly Constructed BuildingsChilled water plant and all coils and terminal units served by the systemIndividual plants supplying more than three zones and with design cooling capacity of 300 kBtu/h (87.9 kW) and larger
Newly Constructed BuildingsHot water plant and all coils and terminal units served by the systemIndividual plants supplying more than three zones and with design heating capacity of 300 kBtu/h (87.9 kW) and larger
Additions or AlterationsZone terminal unit such as VAV boxWhere existing zones served by the same air handling, chilled water, or hot water systems that have DDC
Additions or AlterationsAir handling system or fan coilWhere existing air handling system(s) and fan coil(s) served by the same chilled or hot water plant have DDC
Additions or AlterationsNew air handling system and all new zones served by the systemIndividual systems with design heating or cooling capacity of 300 kBtu/h and larger and supplying more than three zones and more than 75 percent of zones are new
Additions or AlterationsNew or upgraded chilled water plantWhere all chillers are new and plant design cooling capacity is 300 kBtu/h (87.9 kW) and larger
Additions or AlterationsNew or upgraded hot water plantWhere all boilers are new and plant design heating capacity is 300 kBtu/h (87.9 kW) and larger

p.512D. Air economizers, DOAS, HRV or ERV systems shall be tested in accordance with NA7.5.4.

p.516Insulation Conductivity Mean Rating

p.516Nominal Pipe

p.516Nominal Pipe

p.516Nominal Pipe

p.516Nominal Pipe

p.516Nominal Pipe

p.516Fluid Operating

p.516Insulation Conductivity (Btu·in/h·ft2 °F)

p.516(in inches)

p.516(in inches)

p.516(in inches)

p.516(in inches)

p.516(in inches) 8 and larger

p.511H. Duct systems shall be tested in accordance with i or ii below:

p.5133. When certification is required by Title 24, Part 1, Section 10-103.2, the acceptance testing specified by Section 160.3(d)1 and 2 shall be performed by a Certified Mechanical Acceptance Test Technician (CMATT). If the CMATT is operating as an employee, the CMATT shall be employed by a Certified Mechanical Acceptance Test Employer. The CMATT shall disclose on the Certificate of Acceptance a valid CMATT certification identification number issued by an approved Acceptance Test Technician Certification Provider. The CMATT shall complete all Certificate of Acceptance documentation in accordance with the applicable requirements in Section 10-103(a)4.

p.516Temperature

p.516Range (°F)

p.516Temp. (°F)

p.5161 to <1.5

p.5161.5 to < 4

p.5164 to < 8

p.511i. New duct systems that meet the criteria in Subsections a, b and c below or ductwork

p.511that is part of a system that meets the criteria of Section 180.2(b)2B shall be sealed to a leakage rate not to exceed 6 percent of the nominal air handler airflow rate as confirmed through acceptance testing, in accordance with Reference Nonresidential Appendix NA7.5.3.

p.51640-60 0.21-0.27 0.75 (R 6) 0.75 (R 5) 1.0 (R 7) 1.0 (R 6) 1.0 (R 5)

p.516Below 40 0.20-0.26 50 1.0 (R 8.5) 1.5 (R 14) 1.5 (R 12) 1.5 (R 10) 1.5 (R 9) Footnote to TABLE 160.3-D:

p.512E. Demand control ventilation systems required by Section 160.2(c)3 shall be tested in

p.512accordance with NA7.5.5.

p.5161. These thicknesses are based on energy efficiency considerations only. Issues such as water vapor permeability or surface condensation sometimes require vapor retarders or additional insulation.

p.514*Not applicable to systems with nominal cooling capacity greater than 5.0 tons or less than 1.5 tons.

p.512F. Supply fan variable flow controls shall be tested in accordance with NA7.5.6.

p.511a. The duct system provides conditioned air to an occupiable space for a constant

p.512G. Hydronic system variable flow controls shall be tested in accordance with NA7.5.7 and

p.511volume, single zone, space-conditioning system; and

p.512NA7.5.9.

p.511b. The space-conditioning system serves less than 5,000 square feet of conditioned

p.512H. Boilers or chillers that require isolation controls as specified by Section 170.2(c)4Iii or

p.511floor area; and

p.512170.2(c)4Iiii shall be tested in accordance with NA7.5.7.

p.511c. The combined surface area of the ducts located in the following spaces is more than

p.512I. Hydronic systems with supply water temperature reset controls shall be tested in

p.51125 percent of the total surface area of the entire duct system:

p.512accordance with NA7.5.8.

p.511I. Outdoors; or

p.512J. Automatic demand shed controls shall be tested in accordance with NA7.5.10.

p.511II. In a space directly under a roof that has a U-factor greater than the U-factor of

p.512K. Fault detection and diagnostics (FDD) for packaged direct expansion units shall be tested in

p.511the ceiling, or if the roof does not meet the requirements of Section 170.2(a)1; or

p.515TABLE 160.3-D PIPE INSULATION THICKNESS Space heating (Steam, Steam Condensate, Refrigerant, Space Heating)

p.512accordance with NA7.5.11.

Return Duct Sizing for Single Return Duct Systems p.513 Download CSV
System Nominal Cooling Capacity (Ton)*Return Duct Minimum Nominal Diameter (inch)Minimum Total Return Filter Grille Nominal Area (inch2)
1.516500
2.018600
2.520800

p.512L. Automatic fault detection and diagnostics (FDD) for air handling units and zone terminal

p.511III. In a space directly under a roof that has fixed vents or openings to the outside or

D PIPE INSULATION THICKNESS REQUIRED (thickness in inches or R-Value) p.515 Download CSV
Fluid Operating Temperature Range (°F)Insulation Conductivity (Btu·in/h·ft2 °F)Insulation Conductivity Mean Rating Temp. (°F)Nominal Pipe Diameter (in inches) < 1Nominal Pipe Diameter (in inches) 1 to <1.5Nominal Pipe Diameter (in inches) 1.5 to < 4Nominal Pipe Diameter (in inches) 4 to < 8Nominal Pipe Diameter (in inches) 8 and larger
Above 3500.32-0.342504.5 (R 37)5.0 (R 41)5.0 (R 37)5.0 (R 27)5.0 (R 23)
251-3500.29-0.322003.0 (R 24)4.0 (R 34)4.5 (R 35)4.5 (R 26)4.5 (R 22)
201-2500.27-0.301502.5 (R 21)2.5 (R 20)2.5 (R 17.5)3.0 (R 17)3.0 (R 14.5)
141-2000.25-0.291251.5 (R 11.5)1.5 (R 11)2.0 (R 14)2.0 (R 11)2.0 (R 10)
105-1400.22-0.281001.0 (R 7.7)1.5 (R 12.5)1.5 (R 11)1.5 (R 9)1.5 (R 8)
Fluid Operating Temperature Range (°F)Insulation Conductivity (Btu·in/h·ft2 °F)Insulation Conductivity Mean Rating Temp. (°F)Nominal Pipe Diameter (in inches) < 1Nominal Pipe Diameter (in inches) 1 to <1.5Nominal Pipe Diameter (in inches) 1.5 to < 4Nominal Pipe Diameter (in inches) 4 to < 8Nominal Pipe Diameter (in inches) 8 and larger
40-600.21-0.27750.75 (R 6)0.75 (R 5)1.0 (R 7)1.0 (R 6)1.0 (R 5)
Below 400.20-0.26501.0 (R 8.5)1.5 (R 14)1.5 (R 12)1.5 (R 10)1.5 (R 9)

p.512units shall be tested in accordance with NA7.5.12.

p.511unconditioned spaces; or

p.512M. Distributed energy storage DX AC systems shall be tested in accordance with NA7.5.13.

p.511IV. In an unconditioned crawl space; or

p.512N. Thermal energy storage (TES) systems shall be tested in accordance with NA7.5.14.

p.511V. In other unconditioned spaces.

p.513*Not applicable to systems with nominal cooling capacity greater than 2.5 tons or less than 1.5 ton

p.512O. Supply air temperature reset controls shall be tested in accordance with NA7.5.15.

p.511ii. All duct systems that do not meet the criteria in Section 160.3(c)2H shall meet the duct

p.511leakage testing requirements of CMC Section 603.9.2.

p.512P. Water-cooled chillers served by cooling towers with condenser water reset controls shall be

p.512tested in accordance with NA7.5.16.

p.511(d) Mechanical acceptance testing.

p.512Q. When an energy management control system is installed, it shall functionally meet all of the

p.5111. Common areas. Before an occupancy permit is granted, the following systems and equipment serving multifamily common areas shall be certified as meeting the Acceptance Requirements for Code Compliance, as specified by Reference Nonresidential Appendix NA7. These systems and equipment shall also comply with the applicable requirements of Section 160.3(d)3. A Certificate of Acceptance shall be submitted to the enforcement agency that certifies that the equipment and systems meet the acceptance requirements:

p.512applicable requirements of Part 6.

p.512R. Occupant sensing zone controls shall be tested in accordance with NA7.5.17.

p.5122. Multifamily dwelling units. Before an occupancy permit is granted, the following systems and equipment serving multifamily dwelling units shall be certified as meeting the acceptance requirements for code compliance, as specified by the Reference Nonresidential Appendix NA7. These systems and equipment shall also comply with the applicable requirements of Section 160.3(d)3. A Certificate of Acceptance shall be submitted to the enforcement agency that certifies that the equipment and systems meet the acceptance requirements:

p.511A. Outdoor air ventilation systems shall be tested in accordance with NA7.5.1.

p.511B. Constant volume, single zone air conditioning and heat pump unit controls shall be tested

Return Duct Sizing for Multiple Return Duct Systems p.513 Download CSV
System Nominal Cooling Capacity (Ton)*Return Duct 1 Minimum Nominal Diameter (inch)Return Duct 2 Minimum Nominal Diameter (inch)Minimum Total Return Filter Grille Nominal Area (inch2)
1.51210500
2.01412600

p.511in accordance with NA7.5.2.

p.511C. Duct systems shall be tested in accordance with NA7.5.3 where either:

p.512A. Multifamily building central ventilation ducts subject to Section 160.2(b)2C shall be leak

p.511a. They are new duct systems; orp.512

p.512tested in accordance with NA7.18.3.p.513

p.511SECTION 160.3 – MANDATORY REQUIREMENTS FOR SPACE CONDITIONING SYSTEMS IN MULTIFAMILY BUILDINGS

p.512SECTION 160.3 – MANDATORY REQUIREMENTS FOR SPACE CONDITIONING SYSTEMS IN MULTIFAMILY BUILDINGS

p.513SECTION 160.3 – MANDATORY REQUIREMENTS FOR SPACE CONDITIONING SYSTEMS IN MULTIFAMILY BUILDINGS

p.514SECTION 160.3 – MANDATORY REQUIREMENTS FOR SPACE CONDITIONING SYSTEMS IN MULTIFAMILY BUILDINGS

p.515SECTION 160.3 – MANDATORY REQUIREMENTS FOR SPACE CONDITIONING SYSTEMS IN MULTIFAMILY BUILDINGS

p.516SECTION 160.3 – MANDATORY REQUIREMENTS FOR SPACE CONDITIONING SYSTEMS IN MULTIFAMILY BUILDINGS