p.261of compressors. The compressed air system shall include primary storage of at least one gallon per actual cubic feet per minute (acfm) of the largest trim compressor; or
p.262A. Service line piping shall have inner diameters greater than or equal to 3⁄4 inch. Service line piping are pipes
p.2631. Indoor growing, dehumidification. Dehumidification equipment shall be one of the following:
p.2642. Steam trap fault detection. Steam traps shall be equipped with automatic fault detection sensors that shall communicate their operational state to the central steam trap monitoring system as described in Section 120.6(i)1.
p.262that deliver compressed air from distribution piping to end uses.
p.263A. Dehumidifiers subject to regulation under federal appliance standards tested in accordance with 10 CFR
p.261B. The compressed air system shall include a compressor or set of compressors with total effective trim
p.262B. Piping section average velocity. Compressor room interconnection and main header piping shall be sized
p.263430.23(z) and Appendix X or X1 to Subpart B of 10 CFR Part 430 as applicable, and complying with 10 CFR 430.32(v)2;
p.261capacity at least the size of the largest net capacity increment between combinations of compressors, or the size of the smallest compressor, whichever is larger. The total effective trim capacity of single compressor systems shall cover at least the range from 70 to 100 percent of rated capacity. The effective trim capacity of a compressor is the size of the continuous operational range where the specific power of the compressor (kW/100 acfm) is within 15 percent of the specific power at its most efficient operating point. The total effective trim capacity of the system is the sum of the effective trim capacity of the trim compressors. The system shall include primary storage of at least 2 gallons per acfm of the largest trim compressor.
p.262so that at coincident peak flow conditions, the average velocity in the segment of pipe is no greater than 20 ft/sec. Compressor room interconnection and main header piping are the pipes that deliver compressed air from the compressor outlets to the inlet to the distribution piping. Each segment of distribution and service piping shall be sized so that at coincident peak flow conditions, the average velocity in the segment of pipe is no greater than 30 ft/sec. Distribution piping are pipes that deliver compressed air from the compressor room interconnection piping or main header piping to the service line piping.
p.2643. Steam trap strainer installation. Steam traps shall either:
p.263B. Integrated HVAC system with on-site heat recovery designed to fulfill at least 75 percent of the annual
p.264A. Be equipped with an integral strainer and blow-off valve; or
p.263energy for dehumidification reheat;
p.264B. Be installed downstream within 3 feet of a strainer and blow-off valve.
p.263C. Chilled water system with on-site heat recovery designed to fulfill at least 75 percent of the annual
p.2644. Steam trap system acceptance. Before an occupancy permit is granted for steam trap systems subject to Section 120.6(i), the equipment and systems shall be certified as meeting the Acceptance Requirement for Code Compliance, as specified by the Reference Nonresidential Appendix NA7.19. A Certificate of Acceptance shall be submitted to the enforcement agency that certifies that the equipment and systems meet the acceptance requirements specified in NA7.19.
p.263energy for dehumidification reheat; or
p.263D. Solid or liquid desiccant dehumidification system for system designs that require dewpoint of 50°F or
p.262C. Piping total pressure drop. Piping shall be designed such that piping frictional pressure loss at coincident
p.263less.
p.262peak loads is less than 5 percent of operating pressure between the compressor and end use or end use regulator.
p.2632. Indoor growing, electrical power distribution systems. Electrical power distribution systems serving CEH spaces shall be designed so that a measurement device is capable of monitoring the electrical energy usage of aggregate horticultural lighting load.
p.2626. Compressed air system acceptance. Before an occupancy permit is granted for a compressed air system subject to Section 120.6(e), the equipment and systems shall be certified as meeting the acceptance requirements for code compliance, as specified by the Reference Nonresidential Appendix NA7. A certificate of acceptance shall be submitted to the enforcement agency that certifies that the equipment and systems meet the acceptance requirements specified in NA 7.13.
p.264(j) Mandatory requirements for computer rooms. Space-conditioning systems serving a computer room shall meet the
p.2633. Conditioned greenhouses, building envelope. Conditioned greenhouses shall meet the following requirements:
p.264following requirements:
p.2641. Reheat. Each computer room zone shall have controls that prevent reheating, recooling and simultaneous provisions of heating and cooling to the same zone, such as mixing or simultaneous supply of air that has been previously mechanically heated and air that has been previously cooled, either by cooling equipment or by economizer systems.
p.263A. Opaque wall and opaque roof assembly shall meet the requirements of Section 120.7; and B. Nonopaque envelopes shall have two or more glazings separated by either air or gas fill.
p.262(f) Mandatory requirements for elevators. Elevators shall meet the following requirements:
p.2621. The light power density for the luminaires inside the elevator cab shall be no greater than 0.6 watts per square foot.
p.2634. Conditioned greenhouses, space-conditioning systems. Space-conditioning systems used for plant production shall comply with all applicable requirements.
p.2642. Humidification. Humidification shall be adiabatic. Nonadiabatic humidification, including but not limited to steam and infrared, is prohibited.
p.2612. Controls. Compressed air systems with three or more compressors and a combined horsepower rating of more than 100 hp shall operate with controls that are able to choose the most energy efficient combination and loading of compressors within the system based on the current compressed air demand.
p.2643. Fan control. Each unitary air conditioner with mechanical cooling capacity exceeding 60,000 Btu/hr and each chilled water fan system shall be designed to vary the airflow rate as a function of actual load. Fan motor demand shall not exceed 50 percent of design wattage at 66 percent of design fan speed.
p.2635. Horticultural lighting. In a building with CEH spaces or a greenhouse with more than 40 kW of aggregate horticultural lighting load, the electric lighting system used for plant growth and plant maintenance shall meet the following requirements:
p.2622. Elevator cab ventilation fans for cabs without space conditioning shall not exceed 0.33 watts per cfm as measured at maximum speed.
p.2613. Monitoring. Compressed air systems having a combined horsepower rating equal to or greater than 100 hp shall have an energy and air demand monitoring system with the following minimum requirements:
p.264(k) Mandatory requirements for commercial kitchens. Electric readiness for newly constructed commercial kitchens shall
p.263A. The horticultural lighting systems shall have a photosynthetic photon efficacy (PPE) rated
p.2623. When the elevator cab is stopped and unoccupied with doors closed for over 15 minutes, the cab interior lighting and ventilation fans shall be switched off until elevator cab operation resumes.
p.264meet the following requirements:
p.261A. Measurement of system pressure.
p.263in accordance with ANSI/ASABE S640 for wavelengths from 400 to 700 nanometers and meet one of the following requirements:
p.2641. Quick-service commercial kitchens and institutional commercial kitchens shall include a dedicated branch circuit wiring and outlet that would be accessible to cookline appliances and shall meet all of the following requirements:
p.261B. Measurement of amps or power of each compressor.
p.2624. Lighting and ventilation shall remain operational in the event that the elevator cabin gets stuck when passengers are in the cabin.
p.261C. Measurement or determination of total airflow from compressors in cfm.
p.263i. Integrated, nonserviceable luminaires shall have a rated PPE of at least 2.3 micromoles
p.264A. The branch circuit conductors shall be rated at 50 amps minimum.
p.263per joule; or
p.261D. Data logging of pressure, power in kW, airflow in cfm and compressed air system specific efficiency in
p.2625. Elevator Lighting and Ventilation Control Acceptance. Before an occupancy permit is granted for elevators subject to 120.6(f), the following equipment and systems shall be certified as meeting the Acceptance Requirement for Code Compliance, as specified by the Reference Nonresidential Appendix NA7. A Certificate of Acceptance shall be submitted to the enforcement agency that certifies that the equipment and systems meet the acceptance requirements specified in NA7.14.
p.264B. The electrical service panel shall have a minimum capacity of 800 connected amps.
p.261kW/100 cfm at intervals of 5 minutes or less.
p.263ii. Luminaires with removable or serviceable lamps shall have lamps with a rated PPE of at least 2.3
p.2642. The electrical service panel shall be sized to accommodate an additional either 208V or 240V 50-amp breaker.
p.261E. Maintained data storage of at least the most recent 24 months.
p.263micromoles per joule.
p.261F. Visual trending display of each recorded point, load and specific energy.
p.263B. Time-switch lighting controls shall be installed and comply with Section 110.9(b)1, Section 130.4(a)4 and
p.263applicable sections of Reference Nonresidential Appendix NA7.6.2.
p.2614. Leak testing of compressed air piping. Compressed air system piping greater than 50 adjoining feet in length shall be pressure tested after being isolated from the compressed air supply and end uses. The piping shall be pressurized to the design pressure and test pressures shall be held for a length of time at the discretion of the authority having jurisdiction, but in no case for less than 30 minutes, with no perceptible drop in pressure.
p.263C. Multilevel lighting controls shall be installed and comply with Section 130.1(b).
p.262(g) Mandatory requirements for escalators and moving walkways.
p.263(i) Mandatory requirements for steam traps. Steam traps in new industrial facilities and new steam traps added to support
p.2621. Escalators and moving walkways located in airports, hotels, and transportation function areas shall automatically slow to the minimum permitted speed in accordance with ASME A17.1/CSA B44 when not conveying passengers.
p.263new, nonreplacement, process equipment in existing industrial facilities where the installed steam trap operating pressure, which is the steam pressure entering the steam trap during normal design operating conditions, is greater than 15 psig and the total combined connected boiler input rating is greater than 5 million Btu/hr shall meet the following requirements:
p.261If dial gauges are used for conducting this test, these gauges must conform with California Plumbing Code Sections 318.3, 318.4 and 318.5.
p.2622. Escalators and Moving Walkways Acceptance. Before an occupancy permit is granted for escalators and moving walkways subject to 120.6(g), the following equipment and systems shall be certified as meeting the Acceptance Requirement for Code Compliance, as specified by the Reference Nonresidential Appendix NA7. A Certificate of Acceptance shall be submitted to the enforcement agency that certifies that the equipment and systems meet the acceptance requirements specified in NA7.15.
p.261Piping less than or equal to 50 adjoining feet in length shall be pressurized and inspected. Connections shall be tested with a noncorrosive leak-detecting fluid or other leak-detecting methods at the discretion of the authority having jurisdiction.
p.2631. Central steam trap fault detection and diagnostics monitoring. Steam trap systems shall be equipped with a central steam trap monitoring system that:
p.2615. Pipe sizing. Compressed air piping greater than 50 adjoining feet in length shall be designed and installed to minimize frictional losses in the distribution network. These piping installations shall meet the requirements of Section 120.6(e)5A and either Section 120.6(e)5B or 120.6(e)5C:p.262
p.263A. Provides a status update of all steam trap fault detection sensors at no greater than 8-hour intervals.
p.263B. Automatically displays an alarm that identifies which steam trap has a fault once the system has detected a
p.262(h) Mandatory requirements for Controlled Environment Horticulture (CEH) spaces.p.263
p.263fault.p.264
p.261SECTION 120.6 – MANDATORY REQUIREMENTS FOR COVERED PROCESSES
p.262SECTION 120.6 – MANDATORY REQUIREMENTS FOR COVERED PROCESSES
p.263SECTION 120.6 – MANDATORY REQUIREMENTS FOR COVERED PROCESSES
p.264SECTION 120.6 – MANDATORY REQUIREMENTS FOR COVERED PROCESSES