1. Air filtration.

p.483iv. In multifamily buildings with four or more habitable stories, the field verification and

p.483diagnostic testing required in Sections 160.2(b)2Bi, ii and iii which requires an ECC-Rater may alternatively be performed by a certified Mechanical Acceptance Test Technician according to the requirements specified in Reference Appendix NA1.9.

p.483C. Multifamily building central ventilation system field verification.

p.483i. Central ventilation system duct sealing. Ventilation ducts that conform to Subsections a and b below shall meet the duct sealing requirements in California Mechanical Code Section 603.10 and have leakage that is no greater than six percent of the rooftop fan or central fan design airflow rate as confirmed by field verification in accordance with the procedures in Reference Appendix NA7.18.3. The leakage test shall be conducted using a test pressure of 25 Pa (0.1 inches) for ducts serving six or fewer dwelling units and 50 Pa (0.2 inches) for ducts serving more than six dwelling units, and shall measure the leakage of all ductwork between the central fan and the connection point to the in-unit grille or fan.

p.483a. The ventilation ducts serve multiple dwelling units.

p.483b. The ventilation ducts provide continuous airflows or airflows to provide balanced

p.483ventilation to meet the requirements specified in Section 160.2(b)2Aiv or 160.2(b)2Av as applicable.

p.483(c) Common use areas. All occupiable spaces shall comply with the requirements of Subsection 1 and

p.483shall also comply with either Subsection 2 or Subsection 3:

p.4831. Air filtration. A. Mechanical system types specified in Subsections i, ii and iii below shall be designed to

p.483ensure that all recirculated air and all outdoor air supplied to the occupiable space are filtered before passing through any system’s thermal conditioning components. Air filters shall conform to the requirements of Sections 160.2(c)1B, 160.2(c)1C and 160.2(c)1D.

p.483i. Mechanical space-conditioning systems that supply air to an occupiable space through

p.483ductwork exceeding 10 ft (3 m) in length.

p.483ii. Mechanical supply-only ventilation systems and makeup air systems that provide

p.483outside air to an occupiable space.

p.483iii. The supply side of mechanical balanced ventilation systems, including heat recovery

p.483ventilation systems and energy recovery ventilation systems that provide outside air to an occupiable space.

p.483SECTION 160.2 – MANDATORY REQUIREMENTS FOR VENTILATION AND INDOOR AIR QUALITY